Scope
This standard applies to the commissioning quality inspection, acceptance and evaluation of new, expanded and renovated thermal power generation construction projects.

DL/T 5295-2013 Referenced Document

  • DL/T 5210.2-2009 Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit
  • DL/T 5210.3-2009 Code for construction quality acceptance and evaluation of electric power construct Part 3: turbine generator unit
  • DL/T 5210.4-2009 Code for construction quality acceptance and evaluation of electric power construct Part 4: instrumentation and control
  • DL/T 5210.5-2009 Code for construction quality acceptance and evaluation of electric power construct Part 5: Piping & System
  • DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6: The equipment and the system with the water treatment and hydrogen generation
  • DL/T 5210.8-2009 Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation
  • DL/T 659-2006 Code for acceptance test of distributed control system in fossil fuel power plant
  • DL/T 889-2004 Guide of chemistry supervision of thermal equipments for power station capital construction
  • GB 13223 Emission standard of air pollutants for thermal power plants
  • GB 50275-2010 Code for construction and acceptance of fan,compressor and pump installation
  • GB 8978 Integrated wastewater discharge standard
  • GB/T 15057.1 Limestone for chemical industry- Methods of sampling and preparing
  • GB/T 16157 "Determination of Particulate Matter in Exhaust from Stationary Pollution Sources and Sampling Methods of Gaseous Pollutants" Amendment No. 1*2017-12-29 Update
  • GB/T 50375 Evaluating standard for excellent quality of building engineering*2016-08-18 Update
  • GB/T 5484 Methods for chemical analysis of gypsum

DL/T 5295-2013 history

  • 2019 DL/T 5210.6-2019 Electric power construction construction quality acceptance code part 6: adjustment test
  • 2013 DL/T 5295-2013 Code for the unit commissioning quality acceptance and evaluation of fossil power construction projects
Code for the unit commissioning quality acceptance and evaluation of fossil power construction projects



Copyright ©2024 All Rights Reserved