DL/T 5210.8-2009
Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation (English Version)

Standard No.
DL/T 5210.8-2009
Language
Chinese, Available in English version
Release Date
2009
Published By
Professional Standard - Electricity
Status
 2018-07
Replace By
DL/T 5210.2-2018
Latest
DL/T 5210.2-2018
Scope
This part of DL/T 5210 stipulates the construction quality acceptance standards for on-site processing preparations of thermal power generation installation projects and the relevant requirements for individual project construction quality evaluation, single unit quality evaluation and overall project quality evaluation. This section applies to the construction quality acceptance and project quality evaluation of on-site processing preparations for newly built, expanded and renovated thermal power generation installation projects with a single unit capacity of 300MW-1000MW. The construction quality acceptance and project quality evaluation of on-site processing preparations for thermal power generation installation projects below 300MW can be implemented with reference to this section.

DL/T 5210.8-2009 history

  • 2018 DL/T 5210.2-2018 Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit
  • 2009 DL/T 5210.8-2009 Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation

DL/T 5210.8-2009 Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation was changed to DL/T 5210.2-2018 Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit.

Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation



Copyright ©2024 All Rights Reserved