DL/T 5210.2-2018
Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit (English Version)

Standard No.
DL/T 5210.2-2018
Language
Chinese, Available in English version
Release Date
2018
Published By
Professional Standard - Electricity
Latest
DL/T 5210.2-2018
Replace
DL/T 5210.2-2009 DL/T 5210.8-2009
Scope
This part of DL/T 5210 specifies the construction quality acceptance standards for boiler units in thermal power generation projects and the relevant requirements for individual project quality evaluation, single unit quality evaluation and overall project quality evaluation. This section applies to the construction quality acceptance and project quality evaluation of newly built, expanded and rebuilt thermal power generation engineering boiler units with a single unit capacity of 300MW-1000MW. The construction quality acceptance and project quality evaluation of thermal power generation project boiler units below 300MW can be implemented as a reference (see Appendix A, Appendix B, and Appendix C for the contents of waste incineration boilers, biomass incineration boilers, and gas turbine waste heat boilers).

DL/T 5210.2-2018 history

  • 2018 DL/T 5210.2-2018 Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit
  • 2009 DL/T 5210.2-2009 Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit
Code for construction quality acceptance and evaluation of electric power construct Part 2:boiler unit