DL/T 5210.6-2009
Specification for construction quality acceptance and evaluation of electric power construct Part 6: The equipment and the system with the water treatment and hydrogen generation (English Version)

Standard No.
DL/T 5210.6-2009
Language
Chinese, Available in English version
Release Date
2009
Published By
Professional Standard - Electricity
Status
 2019-10
Replace By
DL/T 5210.3-2018
DL/T 5210.6-2019
Latest
DL/T 5210.6-2019
Scope
This part stipulates the construction quality acceptance standards for water treatment and hydrogen production equipment and systems in thermal power generation projects and the relevant requirements for individual project construction quality evaluation, single unit quality evaluation and overall project quality evaluation. This section applies to the construction quality acceptance and project quality evaluation of water treatment and hydrogen production equipment and systems for newly built, expanded and renovated thermal power generation projects with a single unit capacity of 300MW-1000MW. The construction quality acceptance and project quality evaluation of thermal power generation projects below 300MW and conventional islands of nuclear power plants, BOP water treatment and hydrogen production equipment and systems can be implemented with reference to this section.

DL/T 5210.6-2009 history

  • 2019 DL/T 5210.6-2019 Electric power construction construction quality acceptance code part 6: adjustment test
  • 2018 DL/T 5210.3-2018 Code for construction quality acceptance and evaluation of electric power construct Part 3: turbine generator unit
  • 2009 DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6: The equipment and the system with the water treatment and hydrogen generation

DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6: The equipment and the system with the water treatment and hydrogen generation was changed to DL/T 5210.3-2018 Code for construction quality acceptance and evaluation of electric power construct Part 3: turbine generator unit.

Specification for construction quality acceptance and evaluation of electric power construct Part 6: The equipment and the system with the water treatment and hydrogen generation



Copyright ©2024 All Rights Reserved