This standard specifies the basic requirements for the overall design of pressurized water reactor nuclear power plants other than AP1000 category passive advanced pressurized water reactor nuclear power plants to ensure that nuclear power plants within the specified scope can operate safely and reliably. This standard is applicable to the design of other new pressurized water reactor nuclear power plants except AP1000 category passive pressurized water reactor nuclear power plants. The technical transformation of active safety system nuclear power plants under construction and in service can be implemented as a reference.
NB/T 20309-2014 Referenced Document
GB 11806 Regulations for the safe transport of radioactive material*, 2019-04-04 Update
GB 14587 Technical requirements for discharge of radioactive liquid effluents from nuclear power plant
GB 18871 Basic standards for protection against ionizing radiation and for the safety of radiation sources
GB 50267 Seismic Design Standards for Nuclear Power Plants*, 2019-11-29 Update
GB 6249 Regulations for environmental radiation protection of nuclear power plant
GB/T 13976 Radioactive source term of pressurized water reactor nuclear power plant for operation states*, 2021-12-31 Update
GB/T 17569 Classification for the items of pressurized water reactor nuclear power plants*, 2021-10-11 Update
GB/T 19597 Safety requirements for decommissioning of nuclear facilities
GB/T 22158 Code for fire protection design of nuclear power plant*, 2021-10-11 Update
GB/T 4083 General safety principles of nuclear reactor protection system
GB/T 50294 Design code for general plan and transportation of nuclear power plants*, 2014-12-02 Update
NB/T 20017 Structural Integrity Test of Prestressed Concrete Containment in PWR Nuclear Power Plant*, 2021-01-07 Update
NB/T 20018 Containment tightness test of pressurized water reactor nuclear power plant*, 2021-01-07 Update
NB/T 20026 General requirements for instrumentation and control systems important to safety in nuclear power plants*, 2014-10-15 Update
NB/T 20027 Nuclear power plants-main control room-alarm functions and presentation
NB/T 20028.1 The batteries used in nuclear power plants Part 1: Recommended practice for sizing
NB/T 20028.2 The batteries used in nuclear power plants Part 2: Recommended practice for installation design and installation
NB/T 20028.4 The batteries used in nuclear power plants Part 4: Recommended practice for maintenance, testing and replancement
NB/T 20029 Nuclear power plants-Instrumentation and control systems important to safety-Plant-wide radiation monitoring
NB/T 20031 Control of Combustible Gas Concentration in Containment after Accident of PWR Nuclear Power Plant*, 2021-04-26 Update
NB/T 20037.1 Level 1 Probabilistic Safety Assessment Applied to Nuclear Power Plants Part 1: General Requirements
NB/T 20037.2 Level 1 Probabilistic Safety Assessment Applied to Nuclear Power Plants Part 2: Internal Events in Low Power and Shutdown Conditions*, 2021-01-07 Update
NB/T 20037.3 Level 1 Probabilistic Safety Assessment Applied to Nuclear Power Plants Part 3: Internal Flooding During Power Operation*, 2021-01-07 Update
NB/T 20309-2014 history
2014NB/T 20309-2014 General design requirements of pressurized water reactor nuclear power plants with active safety systems