GB/T 29549.2-2013
Specifications for offshore modular drilling rigs on fixed platforms.Part 2:Construction (English Version)

Standard No.
GB/T 29549.2-2013
Language
Chinese, Available in English version
Release Date
2013
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 29549.2-2013
Scope
This part of GB/T 29549 specifies the requirements for the structure, pipeline, outfitting manufacturing, equipment installation and commissioning of modular drilling rigs for fixed offshore oil platforms (hereinafter referred to as modular drilling rigs). This section applies to land construction of modular drilling rigs.

GB/T 29549.2-2013 Referenced Document

  • GB 50166 Standards for construction and acceptance of automatic fire alarm system*2020-01-10 Update
  • GB 7691 Safety code for painting--Safety management general rule
  • GB/T 13288 The assessment of profile grades of steel surface before application of paint and related products.Comparator
  • GB/T 29549.1-2013 Specifications for offshore modular drilling rigs on fixed platforms.Part 1:Design
  • GB/T 8423 Glossary of oil field drilling and production equipment and oil country tubular goods terminology
  • GB/T 8923 Rust grades and preparation grades of steel surfaces before application of paints and related products
  • SY/T 0407 Specification of steel surface preparation before application of paint
  • SY/T 10002 Specifications for the manufacture of structural steel pipes
  • SY/T 10008 Corrosion control in fully immersed areas of offshore steel fixed petroleum production structures*2016-01-07 Update
  • SY/T 10010 Recommended practices for the design, installation and maintenance of electrical systems for fixed and floating offshore petroleum facilities in unclassified areas and Class I, Category 1 and 2 areas*2020-10-23 Update
  • SY/T 10030 Recommended practice for the planning, design and construction of offshore fixed platforms Working stress design method*2018-10-29 Update
  • SY/T 10042 Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems
  • SY/T 5612 Specification for drilling fluid solid phase control equipment for oil and gas drilling equipment*2018-10-29 Update
  • SY/T 5964 Drilling well control device combination, installation, commissioning and usage specifications*2019-11-04 Update
  • SY/T 6223 Drilling fluid clarifying equipment arrangement, installation, operation and maintenance*2013-11-28 Update
  • SY/T 6416 Recommended practice for installation, operation and maintenance of engine*2014-10-15 Update
  • SY/T 6461 Recommended practice for installation and operation of wet steam generators
  • SY/T 6586 Oil and gas drilling equipment drilling rig on-site installation and inspection*2020-10-23 Update
  • YB 3301 Welded H-beam

GB/T 29549.2-2013 history

  • 2013 GB/T 29549.2-2013 Specifications for offshore modular drilling rigs on fixed platforms.Part 2:Construction
Specifications for offshore modular drilling rigs on fixed platforms.Part 2:Construction

GB/T 29549.2-2013 -All Parts




Copyright ©2024 All Rights Reserved