SY/T 6089-2012
Operation procedure for steam huff and puff (English Version)

Standard No.
SY/T 6089-2012
Language
Chinese, Available in English version
Release Date
2012
Published By
Professional Standard - Petroleum
Latest
SY/T 6089-2012
Replace
SY/T 6089-1994
Scope
This standard specifies the construction procedures and quality, health, safety and environmental control requirements for steam huff and puff operations. This standard applies to steam stimulation operations in vertical wells and directional wells.

SY/T 6089-2012 Referenced Document

  • SY 5727-2007 Safety rules of downhole services
  • SY 6354-2008 Safety technology rules for steam injection producing heavy oil
  • SY/T 5328-1996 Wellhead device for thermal recovery
  • SY/T 5587.3-2004 Conventional Well Workover Procedures Part 3: Oil and Gas Well Killing, Alternative Blowout, and Blowout Induction
  • SY/T 5587.5-2004 Conventional Well Workover Procedures Part 5: Wellbore Preparation for Downhole Operations
  • SY/T 5863 The procedure for the ESP pulling out and installation
  • SY/T 5873-2005 Recommended practice for design and execution of sucker rod pumping system
  • SY/T 6084-2007 Using and maintaining for ground drive progressing cavity pumps
  • SY/T 6277-2005 Specification of hydrogen sulfide monitoring and protecting for operation personnel in oil and gas field involving hydrogen sulfide
  • SY/T 6610-2005 Recommended practice for oil and gas well servicing and workover operations involving hydrogen sulfide
  • SY/T 6690-2008 Specification for well control technology of downhole operation

SY/T 6089-2012 history

Operation procedure for steam huff and puff



Copyright ©2024 All Rights Reserved