SY/T 5587.3-2004
Conventional Well Workover Procedures Part 3: Oil and Gas Well Killing, Alternative Blowout, and Blowout Induction (English Version)

Standard No.
SY/T 5587.3-2004
Language
Chinese, Available in English version
Release Date
2004
Published By
Professional Standard - Petroleum
Status
 2014-04
Replace By
SY/T 5587.3-2013
Latest
SY/T 5587.3-2013
Scope
This part of SY/T 5587 specifies the construction design, operation preparation, operation procedures, quality control, occupational safety and environmental protection requirements and data collection for oil and gas well killing, blowout replacement, and induced blowout operations. This section applies to oil and gas well killing, blowout replacement and blowout induced operations.

SY/T 5587.3-2004 history

  • 2013 SY/T 5587.3-2013 Codes for conventional workover job.Part 3: Killing well, displaced flow and induced flow
  • 2004 SY/T 5587.3-2004 Conventional Well Workover Procedures Part 3: Oil and Gas Well Killing, Alternative Blowout, and Blowout Induction
  • 1993 SY/T 5587.3-1993 Oil and water well conventional workover operation operation rules for killing well and replacing blowout
Conventional Well Workover Procedures Part 3: Oil and Gas Well Killing, Alternative Blowout, and Blowout Induction



Copyright ©2024 All Rights Reserved