SY/T 5587.5-2004
Conventional Well Workover Procedures Part 5: Wellbore Preparation for Downhole Operations (English Version)

Standard No.
SY/T 5587.5-2004
Language
Chinese, Available in English version
Release Date
2004
Published By
Professional Standard - Petroleum
Status
 2019-03
Replace By
SY/T 5587.5-2018
Latest
SY/T 5587.5-2018
Scope
This part stipulates the construction preparation, operating procedures and quality control, safety and environmental protection requirements and data collection during the preparation process of oil and water well bores. This section applies to the wellbore preparation and construction operations during downhole operations, including the process control of tubing running operations, sand exploration, sand flushing and well dredging, and casing cutting.

SY/T 5587.5-2004 history

  • 2018 SY/T 5587.5-2018 General well workover operation procedures Part 5: Wellbore preparation for underground operations
  • 2004 SY/T 5587.5-2004 Conventional Well Workover Procedures Part 5: Wellbore Preparation for Downhole Operations
  • 1993 SY/T 5587.5-1993 Oil and water well conventional workover operation oil and water well sand detection surface, sand washing operation rules
Conventional Well Workover Procedures Part 5: Wellbore Preparation for Downhole Operations



Copyright ©2024 All Rights Reserved