This standard specifies the basic requirements for detection and control of boiler feed water pumps (including electric feed water pump sets, steam-driven feed water pumps and pre-pumps) in thermal power plants, as well as the requirements for equipment testing and acceptance. This standard is applicable to boiler feed water pumps supporting units of 300MW and above. For boiler feed water pumps for units below 300MW, you can also refer to them.
DL/T 592-2010 Referenced Document
DL/T 5182 Specifications for instrumentation and control on-site equipment installation, piping, and cable design in thermal power plants*, 2021-01-07 Update
DL/T 641 Electric valve actuators for power plant*, 2015-07-01 Update
GB 4208 Degrees of protection provided by enclosure(IP code)
GB/T 20540.1 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 1: Overview and guidance
GB/T 20540.2 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 2: Physical layer specification and service definition
GB/T 20540.3 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 3: Data link layer service definiton
GB/T 20540.4 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 4: Data link layer protocol specification
GB/T 20540.5 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 5: Application layer service definition
GB/T 20540.6 Digital data communication for measurement and control Fieldbus for use in industrial control systems Type 3: PROFIBUS specification Part 6: Application layer protocol specification
IEC 61158 Corrigendum 1 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application layer protocol specification
DL/T 592-2010 history
2022DL/T 592-2022 Technical conditions for detection and control system of boiler feed water pumps in thermal power plants
2010DL/T 592-2010 Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant
1996DL/T 592-1996 Directives of thermal instrumentation and control for boiler feedwater pump in power plant