This standard specifies the acceptance test methods for gas turbine power plants to determine or inspect the main performance parameters such as power and thermal efficiency and other performances of gas turbine power plants. This standard applies to open cycle gas turbine power plants of conventional combustion systems, and also applies to closed cycle and semi-closed cycle gas turbine power plants. It can also be applied to gas turbine power plants with other heat sources after appropriate modification. Gas turbines under development can be used as a reference.
GB/T 14100-2009 Referenced Document
GB/T 11369 Measurement of Flue Gas Pollutants from Light Duty Gas Turbines
GB/T 15135 Gas turbines—Vocabulary*, 2018-12-28 Update
GB/T 2624.1 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 1: General principles and requirements
GB/T 2624.2 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 2: Orifice plates
GB/T 2624.3 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 3: Nozzles and Venturi nozzles
GB/T 2624.4 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 4: Venturi tubes
GB/T 384 Determination of calorific value of petroleum products
GB/T 8117.1 Rules for steam turbine thermal acceptance tests.Part 1:Method A.High accuracy for large condensing steam turbines
GB/T 8117.2 Rules for steam turbine thermal acceptance tests.Part 2:Method B.Wide range of accuracy for various types and sizes of turbines