GB/T 31461-2015
Guide for run back and fast cut back control in fossil fuel power plant (English Version)

Standard No.
GB/T 31461-2015
Language
Chinese, Available in English version
Release Date
2015
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 31461-2015
Scope
This standard specifies the technical requirements, test and acceptance contents and methods for rapid load reduction control of generating units in thermal power plants. This standard applies to 300 MW and above pulverized coal boiler thermal power generating units, and other types of thermal generating units can be implemented as a reference.

GB/T 31461-2015 Referenced Document

  • DL/T 655 Acceptance test procedure for boiler furnace safety monitoring system in thermal power plant*2017-03-28 Update
  • DL/T 657 Code for acceptance test of modulating control system in fossil fuel power plant*2015-07-01 Update
  • GB/T 26863-2011 Terminology of monitoring and control system of thermal power station

GB/T 31461-2015 history

  • 2015 GB/T 31461-2015 Guide for run back and fast cut back control in fossil fuel power plant
Guide for run back and fast cut back control in fossil fuel power plant



Copyright ©2024 All Rights Reserved