GB/T 31461-2015
Scope
This standard specifies the technical requirements, test and acceptance contents and methods for rapid load reduction control of generating units in thermal power plants. This standard applies to 300 MW and above pulverized coal boiler thermal power generating units, and other types of thermal generating units can be implemented as a reference.
GB/T 31461-2015 Referenced Document
DL/T 655 Acceptance test procedure for boiler furnace safety monitoring system in thermal power plant*, 2017-03-28 Update
DL/T 657 Code for acceptance test of modulating control system in fossil fuel power plant*, 2015-07-01 Update
GB/T 26863-2011 Terminology of monitoring and control system of thermal power station
GB/T 31461-2015 history
2015GB/T 31461-2015 Guide for run back and fast cut back control in fossil fuel power plant