Scope
This part of EJ/T 1175 specifies the design requirements for several commonly used penetration components in shielded sealed chambers. The penetration parts specified in this part include the following five categories:  ——Ventilation penetration parts, including conventional air ducts with compensation shielding and cast iron spiral ducts for air intake and exhaust;  ——Electrical penetration parts, used to connect power cables, signals or Control cables pass through the shielding layer to enter and exit the sealed box;  ——Fluid penetration parts, used to pass process, analysis and detection or waste liquid fluids, power system fluids and control fluids through the shielding layer into and out of the sealed box chamber;  ——Rotary movement penetration parts, Used to introduce rotational motion from outside the shielding layer into the sealed box;  ——Lighting penetration parts, used to introduce the electric light source from outside the shielding layer into the sealed box. This section is applicable to all types of shielded sealed chambers, where the products or materials processed have gamma or neutron penetrating radiation, and the processing volume and radiation intensity require that relevant operations must be performed at a distance behind the shielding layer. This type of shielded sealed box room includes shielded glove box, shielded work box, gamma hot chamber, α-γ hot chamber, etc. This section does not apply to pressure vessels, sealed sources, radioactive material transport containers, and primary circuits and containers of nuclear power plants.

EJ/T 1175.6-2014 Referenced Document

  • EJ/T 1096 Containment enclosures: Classification according to leak tightness and associated checking method
  • EJ/T 1108 Design principles for containment enclosures
  • EJ/T 1175.5-2008 Components for containment enclosures.Part 5: Penetrations for electrical and fluid circuits of unsheilded containment enclosures
  • EJ/T 20050 Criteria for the design and operation of ventilation systems for nuclear installations other than nuclear reactors
  • GB 7000.1 Luminaires - Part 1: General requirements and tests*2017-01-01 Update

EJ/T 1175.6-2014 history

  • 2014 EJ/T 1175.6-2014 Components for containment enclosures.Part 6: Staple penetrations for shielded containment enclosures
  • 1975 EJ 63-1975 Hot Cell Joystick

EJ/T 1175.6-2014 Components for containment enclosures.Part 6: Staple penetrations for shielded containment enclosures has been changed from EJ 61-1975 Check lever.

EJ/T 1175.6-2014 Components for containment enclosures.Part 6: Staple penetrations for shielded containment enclosures has been changed from EJ 62-1975 work box joystick.

EJ/T 1175.6-2014 Components for containment enclosures.Part 6: Staple penetrations for shielded containment enclosures has been changed from EJ 63-1975 Hot Cell Joystick.

Components for containment enclosures.Part 6: Staple penetrations for shielded containment enclosures



Copyright ©2024 All Rights Reserved