NB/T 20259.6-2014
Code of valuation on bill of quantities of nuclear power plant construction works.Part 6: Automatic control instrumentation installation (English Version)

Standard No.
NB/T 20259.6-2014
Language
Chinese, Available in English version
Release Date
2014
Published By
Professional Standard - Energy
Status
 2021-07
Replace By
NB/T 20259.6-2021
Latest
NB/T 20259.6-2021
Scope
This part stipulates the item settings, units of measurement, and calculation rules for each sub-item of the bill of quantities for the automation control instrument installation project of the nuclear power plant construction project, and the lis of professional measures. It also determines the project characteris ics and main work of the lis items. Contents and general applicability. This section applies to the measurement of quantities and the preparation of the bill of quantities in the bill of quantities pricing activities during the contracting and implementation stages of the automation control instrument installation project of nuclear power plant construction projects. This part includes the project settings and engineering quantity calculation rules for the nuclear is and, conventional is and and BOP project directly related to production of the nuclear power plant project. For items that are mis ing or inapplicable in the project setting table of this part, items should be added in accordance with the requirements of NB/T 20259.1-2014 and combined with the provis ons of this part, or refer to GB 50500-2013 "Construction Engineering Bill of Quantities Valuation Specifications" and other Industry bill of quantities pricing standards are implemented. If it involves projects such as construction engineering, process equipment and pipelines, ventilation and air conditioning, electrical equipment, etc., the corresponding projects should be implemented in accordance with other professional regulations in this specification.

NB/T 20259.6-2014 Referenced Document

  • NB/T 20023-2010 Guidelines for cost category and cost account of nuclear power plant construction project
  • NB/T 20259.1-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 1: General rules
  • NB/T 20259.2-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 2: Construction works
  • NB/T 20259.3-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 3: Process equipment and pipe installation
  • NB/T 20259.4-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 4: Ventilation and air-conditioning
  • NB/T 20259.5-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 5: Electrical equipment installation

NB/T 20259.6-2014 history

  • 2021 NB/T 20259.6-2021 Bill of Quantities Valuation Specifications for Nuclear Power Plant Construction Projects Part 6: Installation Engineering of Automation Control Instruments
  • 2014 NB/T 20259.6-2014 Code of valuation on bill of quantities of nuclear power plant construction works.Part 6: Automatic control instrumentation installation
Code of valuation on bill of quantities of nuclear power plant construction works.Part 6: Automatic control instrumentation installation



Copyright ©2024 All Rights Reserved