These regulations apply to the construction drawing design of thermal power projects of newly built, expanded (renovated) chemical enterprises, including thermal power stations (factories), boiler rooms, steam systems, turbine-generator units and supporting auxiliary systems (including slag removal, ash removal , desulfurization, denitrification system) and the process, equipment layout and pipeline design of supporting equipment.
HG/T 20692-2014 Referenced Document
DL/T 5366 Technical code for stress calculating of steam/water piping in power plant*, 2014-06-29 Update
GB 50236 Code for construction of field equipment, industrial pipe welding engineering
GB/T 12459 Steel buttwelding pipe fittings—Types and parameter*, 2017-02-28 Update