NB/T 20175-2012
Requirements for installation and acceptance of fuel handling and storage system at PWR plant (English Version)

Standard No.
NB/T 20175-2012
Language
Chinese, Available in English version
Release Date
2012
Published By
Professional Standard - Energy
Latest
NB/T 20175-2012
Scope
This standard specifies the general technical requirements for fuel operation and storage system equipment in pressurized water reactor nuclear power plants. This standard applies to the on-site installation and acceptance of fuel operation and storage system equipment in pressurized water reactor nuclear power plants.

NB/T 20175-2012 Referenced Document

  • GB/T 16702 Design code for mechanical components in nuclear island of pressurized water reactor nuclear power plants*2019-12-31 Update
  • NB/T 20001 Manufacturing specifications for nuclear island machinery and equipment in pressurized water reactor nuclear power plants*2023-05-26 Update
  • NB/T 20002.1 Welding code for nuclear island mechanical equipment of pressurized water reactor nuclear power plant Part 1: General requirements*2021-12-22 Update
  • NB/T 20002.2 Welding code for nuclear island mechanical equipment of pressurized water reactor nuclear power plant Part 2: Acceptance of welding filler materials*2021-12-22 Update
  • NB/T 20002.3 Welding code for nuclear island machinery and equipment of pressurized water reactor nuclear power plant Part 3: Welding procedure qualification*2021-12-22 Update
  • NB/T 20002.4 Welding code for mechanical components of PWR nuclear islands.Part 4: Qualification of filler materials*2013-06-08 Update
  • NB/T 20002.6 Welding code for nuclear island machinery and equipment of pressurized water reactor nuclear power plant Part 6: product welding*2021-12-22 Update
  • NB/T 20003.3 Non-destructive testing of nuclear island machinery and equipment in nuclear power plants Part 3: Radiographic testing*2021-01-07 Update
  • NB/T 20003.4 Non-destructive testing of nuclear island machinery and equipment in nuclear power plants Part 4: Penetration testing*2021-01-07 Update
  • NB/T 20003.7 Non-destructive testing of nuclear island machinery and equipment in nuclear power plants Part 7: Visual testing*2021-01-07 Update
  • NB/T 20133.1 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 1:General requirements
  • NB/T 20133.6 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 6:Coating operation
  • NB/T 47015 Welding specification for pressure vessels

NB/T 20175-2012 history

  • 2012 NB/T 20175-2012 Requirements for installation and acceptance of fuel handling and storage system at PWR plant
Requirements for installation and acceptance of fuel handling and storage system at PWR plant