DL/T 5419-2009
Specification for water & soil conservation technical schemes of hydropower project (English Version)

Standard No.
DL/T 5419-2009
Language
Chinese, Available in English version
Release Date
2009
Published By
Professional Standard - Electricity
Status
 2021-07
Replace By
NB/T 10509-2021
Latest
NB/T 10509-2021
Scope
This standard specifies the basic principles and technical requirements for the preparation of soil and water conservation plans for hydropower construction projects. This standard is applicable to the preparation of soil and water conservation plans during the feasibility study phase of new, expanded, and reconstructed large- and medium-sized hydropower construction projects. The water and soil conservation design work in the pre-feasibility study, feasibility study, bidding design, construction drawing design and other stages of large and medium-sized hydropower construction projects for new construction, expansion and reconstruction can be implemented as a reference; the preparation of water and soil conservation plans and various stages of small hydropower construction projects Design work can be carried out as a reference.

DL/T 5419-2009 Referenced Document

  • DL/T 5353 Design specification for slope of hydropower and water conservancy project
  • GB 50201 Standard for flood control*2014-06-23 Update
  • GB 50286 Code for design of levee project*2012-12-25 Update
  • GB 50330 Technical code for building slope engineering*2013-11-01 Update
  • GB 50433 Soil and Water Conservation Technical Standards for Production and Construction Projects*2018-11-08 Update
  • GB 50434 Control standards for soil and water loss on development and construction projects*2018-11-01 Update
  • GB/T 15776 Afforestation technical regulations*2023-05-23 Update
  • GB/T 16453.1 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of slope land
  • GB/T 16453.2 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of waste land
  • GB/T 16453.3 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of gullies
  • GB/T 16453.4 Comprehensive control of soil and water conservation.Technical specification.Small engineering of store,drainage and draw water
  • GB/T 16453.5 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of wind erosion
  • GB/T 16453.6 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of collapse hill
  • SL 277 Technical code of practice on water and soil conservation monitoring(explanation)
  • SL 379 Design specification for hydraulic retaining wall
  • SL 73.6 Drawing standard of water resources and hydroelectric engineering for soil and water conservation drawing*2015-10-28 Update

DL/T 5419-2009 history

  • 2021 NB/T 10509-2021 Technical specifications for soil and water conservation in hydropower construction projects
  • 2009 DL/T 5419-2009 Specification for water & soil conservation technical schemes of hydropower project
Specification for water & soil conservation technical schemes of hydropower project



Copyright ©2024 All Rights Reserved