This standard specifies the accounting indicators for station site selection and design fees, station site condition survey fees, civil engineering fees, station equipment fees, project management fees and other expenses for the construction of strong motion station projects. This standard is applicable to the preparation and approval of budgets for new single projects of fixed stations with strong vibrations in free sites under normal circumstances. It does not include project feasibility study, preliminary design, project bidding, operation and maintenance and other special expenses. Strong vibration station reconstruction and expansion projects and strong vibration observation dedicated station/array construction projects can be used as a reference.
T/SSC 1-2019 history
2024T/SSC 1-2024 Technical specification for seismic ground motion parameters mapping of seaarea
2023T/SSC 1-2023 Technical specification for seismic switch of elevator based on earthquake early warning information
2022T/SSC 1-2022 Maximum credible ground motion evaluation of project site— Stochastic finite fault method
2021T/SSC 1-2021 Seismic destructive power evaluation based on strong motion records
2019T/SSC 1-2019 Quota for the construction of strong motion station