SL 77-1994
Hydrological calculation norms for small hydro power (English Version)

Standard No.
SL 77-1994
Language
Chinese, Available in English version
Release Date
1994
Published By
Professional Standard - Water Conservancy
Status
 2014-03
Replace By
SL 77-2013
Latest
SL 77-2013
Scope
This specification is applicable to the hydrological analysis and calculation in the feasibility study and preliminary design stage of various small hydropower stations with an installed capacity of less than 25,000 kW (including 25,000 kW), and should also be used as a reference in the planning stage. For power stations with an installed capacity of less than 500kW, the content can be appropriately simplified and requirements relaxed according to the actual situation; for micro power stations with an installed capacity of less than 100kW, reference can be made to the implementation. See Appendix A for details.

SL 77-1994 history

  • 2013 SL 77-2013 Hydrological calculation code for small hydropower stations
  • 1994 SL 77-1994 Hydrological calculation norms for small hydro power
Hydrological calculation norms for small hydro power



Copyright ©2024 All Rights Reserved