SY/T 5600-2016
The technical specifications for operation of petroleum wireline logging (English Version)

Standard No.
SY/T 5600-2016
Language
Chinese, Available in English version
Release Date
2017
Published By
Professional Standard - Petroleum
Latest
SY/T 5600-2016
Replace
SY/T 5600-2010 SY/T 6752-2009 SY/T 6594.2-2004 SY/T 6790-2010
Scope
This standard specifies the technical requirements for wireline logging preparation, on-site installation, on-site operations, handling of special situations, and conventional logging projects for open hole and cased wells. This standard applies to process control and on-site supervision of conventional wireline logging operations.

SY/T 5600-2016 history

  • 2017 SY/T 5600-2016 The technical specifications for operation of petroleum wireline logging
  • 2010 SY/T 5600-2010 The technical specifications for operation of petroleum wireline logging
  • 2009 SY/T 6413-2009 CNC logging operation procedures
  • 2005 SY/T 5465-2005 Operating specification for injection and production profile logging
  • 2002 SY/T 5600-2002 The operating regulation of open hole and cased hole logging
  • 2000 SY/T 5465-2000 Operating procedure for production profile logging in production well
  • 1999 SY/T 6413-1999 Computerized logging system data collection roles
  • 1970 HB 18.43.2-1998 Guidelines for third-party certification and accreditation - Guide 43 - Proficiency testing by interlaboratory comparisons - Part 2: Selection and use of proficiency testing schemes by laboratory accreditation bodies
  • 1996 SY/T 6180-1996 C/O Ratio Energy Spectrum Logging Operation Regulations
  • 1995 SY/T 5776.1-1995 Injection Profile Logging Operation Rules Water Injection Profile
  • 1994 SY/T 5941-1994 Technical Regulations for Formation Dip Logging Operation

SY/T 5600-2016 The technical specifications for operation of petroleum wireline logging has been changed from SY/T 6752-2009 The specification for operation of nuclear magnetic resonance imaging logging.

SY/T 5600-2016 The technical specifications for operation of petroleum wireline logging has been changed from SY/T 6594.2-2004 Electrical and Acoustic Imaging Logging Operation Quality Monitoring Specification Part 2: Logging Operation.

SY/T 5600-2016 The technical specifications for operation of petroleum wireline logging has been changed from SY/T 6790-2010 The specification for operation of cased hole resistivity logging.

The technical specifications for operation of petroleum wireline logging



Copyright ©2024 All Rights Reserved