DL/T 1466-2015
Technical guide for live working on 750kV AC transmission line with two circuits on one tower (English Version)

Standard No.
DL/T 1466-2015
Language
Chinese, Available in English version
Release Date
2015
Published By
Professional Standard - Electricity
Latest
DL/T 1466-2015
Scope
This standard specifies the technical requirements for live operation of 750kV AC double-circuit transmission lines on the same tower, operation precautions, testing, transportation and storage of work tools, etc. This standard is applicable to live operations of 750kV AC double-circuit transmission lines on the same tower in areas with an altitude of 3500m and below.

DL/T 1466-2015 Referenced Document

  • DL 409 Rules of safe operation in power industry (electric power line part)
  • DL/T 463 Insulator clamps for live work
  • DL/T 878 Guidelines for testing insulating tools for live working
  • DL/T 966 Technical guide for live working in transmission line
  • DL/T 974 Tool warehouse for live working*2018-12-25 Update
  • DL/T 976 Preventive test code of tools, devices and equipment for live working*2017-11-15 Update
  • GB 13398 Insulating hollow tubes and foam-filled tubes and solid rods for live working
  • GB/T 13035 Live working.Insulating ropes
  • GB/T 14286 Terminology for live working tools, devices and equipment*2021-08-20 Update
  • GB/T 18037 Technical requirements and design guide for live working tools
  • GB/T 2900.55 Electrotechnical terminology.Live working*2016-04-25 Update
  • GB/T 6568 Shielding clothing for live work*2024-03-15 Update

DL/T 1466-2015 history

  • 2015 DL/T 1466-2015 Technical guide for live working on 750kV AC transmission line with two circuits on one tower



Copyright ©2024 All Rights Reserved