- Standard No.
- JGJ/T 135-2018
- Language
- Chinese, Available in English version
- Release Date
- 2018
- Published By
- Professional Standard - Construction Industry
- Latest
-
JGJ/T 135-2018
- Replace
-
JGJ 135-2007
- Scope
- This standard applies to the design, construction and acceptance of carrier piles in construction projects.
JGJ/T 135-2018 Referenced Document
- GB 50007 Code for design of building foundation
- GB 50010 Code for design of concrete structures
- GB 50202 Standard for acceptance of construction quality of building foundation
- GB 51004 Construction code for building foundation engineering
- JGJ 106 Technical code for testing of building foundation piles
- JGJ 6 Technical code for tall building raft foundations and box foundations
- JGJ 79 Technical code for ground treatment of buildings
- JGJ 94 Technical code for building pile foundations
JGJ/T 135-2018 history
- 2018 JGJ/T 135-2018 Technical standard for piles with ram-compacted bearing sphere
- 2007 JGJ 135-2007 Specification for design of ram-compacted piles with bearing base
- 2001 JGJ/T 135-2001 Specification for design of ram-compaction piles with composite bearing base
JGJ/T 135-2018 Technical standard for piles with ram-compacted bearing sphere has been changed from JGJ 135-2007 Specification for design of ram-compacted piles with bearing base.