This part of IEC 62257 provides information on the responsibilities involved in the implementation of rural power systems. In Clause 5, this technical specification presents contractual relationships to be built between the different participants to a project. Throughout the project, responsibilities are to be clearly defined and contractual commitments controlled. Clause 6 provides relevant tests to be applied to renewable energy and hybrid electrification systems. Clause 7 provides proposed quality assurance principles to be implemented. In Clause 8, requirements are proposed for recycling and protection of the environment. In Annex A of this technical specification, further technical considerations for contractual liabilities are provided.
IEC TS 62257-3:2015 Referenced Document
CISPR 22-2008 Information technology equipment – Radio disturbance characteristics – Limits and methods of measurement
IEC 60060-2:2010 High-voltage test techniques - Part 2: Measuring systems
IEC 60068-1:2013 Environmental testing - Part 1: General and guidance
IEC 60068-2-10:2005 Environmental testing - Part 2-10: Tests - Test J and guidance: Mould growth
IEC 60068-2-1:2007 Environmental testing - Part 2-1: Tests - Test A: Cold
IEC 60068-2-27:2008 Environmental testing - Part 2-27: Tests - Test Ea and guidance: Shock
IEC 60068-2-2:2007 Environmental testing - Part 2-2: Tests - Test B: Dry heat
IEC 60068-2-30:2005 Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
IEC 60068-2-31:2008 Environmental testing - Part 2-31: Tests - Test Ec: Rough handling shocks, primarily for equipment-type specimens
IEC 60068-2-52:1996 Environmental testing - Part 2: Tests - Test Kb: Salt mist, cyclic (sodium chloride solution)
IEC 60068-2-5:2010 Environmental testing - Part 2-5: Tests - Test Sa: Simulated solar radiation at ground level and guidance for solar radiation testing
IEC 60068-2-6:2007 Environmental testing - Part 2-6: Tests - Test Fc: Vibration (sinusoidal)
IEC 60068-2-75:2014 Environmental testing - Part 2-75: Tests - Test Eh: Hammer tests
IEC 60076-10:2005 Power transformers - Part 10: Determination of sound levels
IEC 60364-6:2006 Low-voltage electrical installations - Part 6: Verification
IEC 60529:1989 Degrees of protection provided by enclosures (IP code)
IEC 60695-2-10:2013 Fire hazard testing - Part 2-10: Glowing/hot-wire based test methods - Glow-wire apparatus and common test procedure
IEC 60695-2-12:2010 Fire hazard testing. Part 2-12: Glowing/hot-wire based test methods .Glow-wire flammability index (GWFI) test method for materials
IEC 60721-1:1990 Classification of environmental conditions; part 1: environmental parameters and their severities
IEC 60721-2-1:2013 Classification of environmental conditions - Part 2-1: Environmental conditions appearing in nature - Temperature and humidity
IEC 60721-3-1:1997 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 1: Storage
IEC 60721-3-2:1997 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 2: Transportation
IEC 60721-3-3:1994 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities; section 3: Stationary use at weatherprotected locations
IEC 60721-3-4:1995 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 4: Stationary use at non-weatherprotected locations
IEC 61000-2-2:2002 Electromagnetic compatibility (EMC) - Part 2-2: Environment; Compatibility levels for low-frequency conducted disturbances and signalling in public low-voltage power supply systems
IEC 61000-3-2:2014 Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current <= 16 A per phase)
IEC TS 62257-3:2015 history
2015IEC TS 62257-3:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 3: Project development and management
2004IEC TS 62257-3:2004 Recommendations for small renewable energy and hybrid systems for rural electrification - Part 3: Project development and management