CFR 46-61.40-2014
Shipping. Part61:Periodic tests and inspections. Subpart61.40:Design verification and periodic testing of vital system automation. Section61.40-10:Test procedure details.

Standard No.
CFR 46-61.40-2014
Release Date
2014
Published By
US-CFR-file
Latest
CFR 46-61.40-2014
Scope
(a) Test procedure documents must be in a step-by-step or checkoff list format.?Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm setpoints, the procedure to be followed, and the expected test result.

CFR 46-61.40-2014 history

  • 2014 CFR 46-61.40-2014 Shipping. Part61:Periodic tests and inspections. Subpart61.40:Design verification and periodic testing of vital system automation. Section61.40-10:Test procedure details.



Copyright ©2024 All Rights Reserved