DL/T 1275-2013
Guide for on-site partial discharge measurement for 1000kV power transformers (English Version)

Standard No.
DL/T 1275-2013
Language
Chinese, Available in English version
Release Date
2013
Published By
Professional Standard - Electricity
Latest
DL/T 1275-2013
Scope
The wooden standard explains the purpose, requirements, methods and on-site interference suppression measures of the 1000kV AC UHV transformer on-site partial discharge measurement test, and proposes relevant requirements for measuring the partial discharge of the 1000kV AC UHV transformer using the pulse current method under the AC test voltage. . This standard is suitable for on-site partial discharge measurement of 1000kV AC ultra-high transformers.

DL/T 1275-2013 Referenced Document

  • DL/T 417 Guidelines for On-site Measurement of Partial Discharge of Power Equipment
  • GB 1094.3 Power transformers Part 3: Insulation levels,dielectric tests and external clearances in air
  • GB/T 50832 1000kV System Electrical Installation Engineering Electrical Equipment Handover Test Standard
  • GB/T 7354 High-voltage test techniques—Partial discharge measurements*2018-09-17 Update
  • GB/Z 24843 Technical specification of 1000kV single phase oil-immersed auto-transformer
  • GB/Z 24846 Preventive test standards of 1000kV AC electrical equipments

DL/T 1275-2013 history

  • 2013 DL/T 1275-2013 Guide for on-site partial discharge measurement for 1000kV power transformers
Guide for on-site partial discharge measurement for 1000kV power transformers