This standard stipulates the functional requirements for load reduction (run back) of auxiliary machines in pulverized coal boiler thermal power generating units, as well as the content and methods of testing and acceptance, as well as the quality indicators that should be achieved. This standard is applicable to pulverized coal boiler thermal power generating units of 300MW and above. Other types of thermal power generating units can be implemented as a reference.
DL/T 1213-2013 Referenced Document
DL/T 655 Acceptance test procedure for boiler furnace safety monitoring system in thermal power plant*, 2017-03-28 Update
DL/T 657-2006 Code for acceptance test of modulating control system in fossil fuel power plant
DL/T 701-2012 Thermopower automation-vocabulary for fossil fired plant
DL/T 1213-2013 history
2013DL/T 1213-2013 Technical code for run back in fossil fuel power plant