EN 15273-3:2013
Railway applications - Gauges - Part 3: Structure gauges (Incorporates Amendment A1: 2016)

Standard No.
EN 15273-3:2013
Release Date
2013
Published By
European Committee for Standardization (CEN)
Status
Latest
EN 15273-3:2013
Replace By
EN 15273-3+A1-2016
Replace
FprEN 15273-3-2012
Scope
This standard: defines the various profiles needed to install, verify and maintain the various structures near the structure gauge; lists the various phenomena to be taken into account to determine the structure gauge; defines a methodology that may be used to calculate the various profiles from these phenomena; lists the rules to determine the distance between the track centres; lists the rules to be complied with when building the platforms; lists the rules to determine the pantograph gauge; lists the formulae needed to calculate the structure gauges in the catalogue. The defined gauge includes the space to be gauged and maintained to allow the running of rolling stock, and the rules for calculation and verification intended for sizing the rolling stock to run on one or several infrastructures without interference risk. This standard defines methodologies to demonstrate gauge compatibility between infrastructure and rolling stock. This standard defines the responsibilities of the following parties: a) for the infrastructure: 1) gauge clearance; 2) maintenance; 3) infrastructure monitoring. b) for the rolling stock: 1) compliance of the operating rolling stock with the gauge concerned; 2) maintenance of this compliance over time. The gauges included in these standards have been developed as part of their application on European railways. Other networks such as regional, local, urban and suburban networks may apply the gauge regulations defined in this standard. They may be required to make use of specific methodologies, particularly where: specific rolling stock is used (for example: underground trains, trams, etc. operating on two rails); use occurs in other ranges of radii; others, etc. The catalogue included in this standard only includes a selection of gauges and is not exhaustive. Each network is free to define the gauges in accordance with their own needs. 11 15273-3:2013 (E)

EN 15273-3:2013 Referenced Document

  • EN 13232-1:2003 Railway applications - Track - Switches and crossings - Part 1: Definitions
  • EN 13803-1:2010 Railway applications - Track - Track alignment design parameters - Track gauges 1435 mm and wider - Part 1: Plain line
  • EN 15273-2:2013 Railway applications - Gauges - Part 2: Rolling stock gauge (Incorporates Amendment A1: 2017)
  • EN 50119:2009 Railway applications - Fixed installations - Electric traction overhead contact lines (Incorporates Amendment A1: 2013)
  • EN 50367:2012 Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line (to achieve free access) (Incorporating corrigendum August 2013)

EN 15273-3:2013 history

  • 2013 EN 15273-3:2013 Railway applications - Gauges - Part 3: Structure gauges (Incorporates Amendment A1: 2016)
  • 2009 EN 15273-3:2009 Railway applications - Gauges - Part 3: Structure gauges



Copyright ©2024 All Rights Reserved