This part of BS 5410 gives recommendations and guidance on the design, installation,commissioning and maintenance of oil burning installations for heating,hot water and steam supply services having a total rated output of over 45 kW and/or an oil storage capacity above 3 500 L.
This part of BS 5410 is applicable to installations burning liquid fuel conforming to BS 2869:2010+A1,including biofuels, for example those containing fatty acid methyl esters (FAME) conforming to BS EN 14214, and blends thereof.
The standard covers the provision of new installations and also gives guidance on the modernizing of existing installations. The standard also gives recommendations and guidance on the selection and installation of oil tanks associated with these installations.
This part of BS 5410 is applicable to the oil burning equipment forming part of a multi-fuel installation in which oil is not burnt simultaneously with any other fuel. It is not applicable to oil fired systems for marine installations. The standard also gives recommendations on thermal fluid heaters and on portable plants, for example those used for emergency or temporary heat supply.
The standard is intended for use by designers, specifiers,installers and building owners.
BS 5410-2:2013 Referenced Document
BS 1212-1 Float operated valves - Specification for piston type float operated valves (copper alloy body) (excluding floats)
BS 1212-2 Float operated valves — Part 2 : Specification for diaphragm type float operated valves (copper alloy body) (excluding floats)
BS 1212-3 Float operated valves — Part 3 : Specification for diaphragm type float operated valves (plastics bodied) for cold water services only (excluding floats)
BS 1710 Specification for identification of pipelines and services*, 2014-12-31 Update
BS 5306 Fire extinguishing installations and equipment on premises. Recharging of portable fire extinguishers. Code of practice*, 2015-03-31 Update
BS 5410-1 Code of practice for liquid fuel firing. Installations for space heating and hot water supply purposes for domestic buildings*, 2019-08-31 Update
BS 5970 Thermal insulation of pipework, ductwork, associated equipment and other industrial installations in the temperature range of -100°C to +870°C. Code of practice
BS 7430 Code of practice for protective earthing of electrical installations
BS 7671 Requirements for Electrical Installations. IET Wiring Regulations*, 2022-03-28 Update
BS 845-1 Methods for Assessing thermal performance of boilers for steam, hot water and high temperature heat transfer fluids — Part 1 : Concise procedure
BS 845-2 Methods for Assessing thermal performance of boilers for steam, hot water and high temperature heat transfer fluids — Part 2 : Comprehensive procedure
BS 9999 Fire safety in the design, management and use of buildings. Code of practice*, 2017-01-31 Update
BS EN 1228 Plastics piping systems. Glass-reinforced thermosetting plastics (GRP) pipes. Determination of initial specific ring stiffness
BS EN 1567 Building valves. Water pressure reducing valves and combination water reducing valves. Requirements and tests
BS EN 267 Forced draught burners for liquid fuels*, 2020-01-31 Update
BS EN 303-1 Heating boilers. Heating boilers with forced draught burners. Terminology, general requirements, testing and marking*, 2017-09-21 Update
BS EN 303-2 Heating boilers. Heating boilers with forced draught burners. Special requirements for boilers with atomizing oil burners*, 2017-09-04 Update
BS EN 303-4 Heating boilers - Heating boilers with forced draught burners - Heating boilers with forced draught burners - Special requirements for boilers with forced draught oil burners with outputs up to 70 kW and a maximum operating pressure of 3 bar - Terminology
BS 5410-2:2013 history
2018BS 5410-2:2018 Code of practice for liquid fuel firing. Non-domestic installations
2013BS 5410-2:2013 Code of practice for oil firing.Part 2:Installations over 45 kW output capacity for space heating, hot water and steam supply services
1978BS 5410-2:1978 Code of practice for oil firing - Installations of 45 kW and above output capacity for space heating, hot water and steam supply services