This standard specifies the general principles and technical requirements that should be followed when photovoltaic power generation systems are connected to the power grid. This standard applies to newly built, rebuilt and expanded photovoltaic power generation systems that are connected to the power grid through a voltage level of 380 V and connected to the user side through a voltage level of 10 (6) kV.
GB/T 29319-2012 Referenced Document
DL/T 448 Technical management regulations for electric energy metering devices*, 2016-12-05 Update
GB/T 12325 Power quality.Deviation of supply voltage
GB/T 12326 Power Quality Voltage Fluctuations and Flicker
GB/T 14549 Quality of electric energy supply harmonics in public supply network
GB/T 15543 Power quality.Three-phase voltage unbalance
GB/T 16895.32 Low voltage electrical installations—Part 7-712: Requirements for special installations or locations—Solar photovoltaic (PV) power supply systems*, 2021-04-30 Update
GB/T 17215.322 Electricity metering equipment (a.c.).Particular requirement.Part 22:Static meters for active energy(classes 0.2S and 0.5S)
GB/T 19862 General requirements for monitoring equipment of power quality*, 2016-08-29 Update
GB/T 24337 Power quality.Interharmonics in public supply network
GB/T 29319-2012 history
2024GB/T 29319-2024 Technical regulations for connecting photovoltaic power generation systems to distribution grids
2012GB/T 29319-2012 Technical requirements for connecting photovoltaic power system to distribution network