SL 585-2012
Guide for short-circuit current calculation in three-phase a.c.systems of hydraulic and hydroelectric engineering (English Version)

Standard No.
SL 585-2012
Language
Chinese, Available in English version
Release Date
2012
Published By
Professional Standard - Water Conservancy
Latest
SL 585-2012
Scope
This standard is applicable to the calculation of short-circuit current of three-phase AC systems with nominal voltage of 0.38~500KV and frequency of 50Hz in water conservancy and hydropower projects.

SL 585-2012 Referenced Document

  • DL/T 5222 Conductor and Electrical Selection Design Practice*2021-12-22 Update
  • DL/T 559 220kV~750kV Power Grid Relay Protection Device Operation Setting Regulations*2018-12-25 Update
  • DL/T 584 3kV~110kV Power Grid Relay Protection Device Operation Setting Regulations*2017-12-27 Update
  • DL/T 684 Guide of calculating setting of relay protection for large generator and transformer
  • GB/T 14285 Technical regulations for relay protection and safety automatic devices*2023-11-27 Update
  • GB/T 156 Standard voltages*2017-11-01 Update
  • SL 587 Guide for grounding design of hydro-power engineering

SL 585-2012 history

  • 2012 SL 585-2012 Guide for short-circuit current calculation in three-phase a.c.systems of hydraulic and hydroelectric engineering
Guide for short-circuit current calculation in three-phase a.c.systems of hydraulic and hydroelectric engineering



Copyright ©2024 All Rights Reserved