EN 13480-6:2012
Metallic industrial piping - Part 6: Additional requirements for buried piping (Incorporates Amendment A1: 2016)

Standard No.
EN 13480-6:2012
Release Date
2012
Published By
European Committee for Standardization (CEN)
Status
Replace By
EN 13480-6:2012/A1:2016
Latest
EN 13480-6:2017/PRA1:2018
Replace
EN 13480-6-2004
Scope
This document specifies requirements for industrial piping either totally buried or partly buried and partly run in sleeves or similar protection. It is used in conjunction with the other six parts of EN 13480. Where buried piping subject to This standard connects to piping installed under other jurisdiction such as pipelines, the transition should be made at a closing element e. g. an isolating or regulating valve separating the two sections. This should be close to the boundary of the industrial site, but may be inside or outside the boundary. Operating temperature up to 75 ℃. NOTE For higher temperatures reference should be made to EN 13941+A1:2010, but it should be kept in mind, that CEN/TC 107 only deals with pre-insulated piping with temperatures up to 140 ℃ and diameters up to 800 mm, which is state of the art for these products.

EN 13480-6:2012 Referenced Document

EN 13480-6:2012 history

  • 2018 EN 13480-6:2017/PRA1:2018 Metallic industrial piping - Part 6: Additional requirements for buried piping
  • 2017 EN 13480-6:2017 Metallic industrial piping - Part 6: Additional requirements for buried piping
  • 2016 EN 13480-6:2012/A1:2016 Metallic industrial piping - Part 6: Additional requirements for buried piping
  • 2012 EN 13480-6:2012 Metallic industrial piping - Part 6: Additional requirements for buried piping (Incorporates Amendment A1: 2016)
  • 2004 EN 13480-6:2004 Metallic industrial piping - Part 6: Additional requirements for buried piping



Copyright ©2024 All Rights Reserved