AS 4032.3:2004
Water supply - Valves for the control of hot water supply temperatures - Requirements for field testing, maintenance or replacment of thermostatic mixing valves, tempering valves and end of line temperature control devices

Standard No.
AS 4032.3:2004
Release Date
2004
Published By
Standard Association of Australia (SAA)
Status
 2022-06
Replace By
AS 4032.3:2022
Latest
AS 4032.3:2022
Scope
Specifies minimum requirements for field testing, maintenance, and the frequency with which this work shall be conducted, of thermostatic mixing valves, tempering valves and end-of-line temperature-actuated devices.

AS 4032.3:2004 Referenced Document

  • AS 4032.1 Water supply - Valves for the control of heated water supply temperatures - Thermostatic mixing valves - Materials design and performance requirements*2024-04-18 Update
  • AS 4032.2 Water supply, hot water supply, temperature control valve, thermostatic valve and terminal temperature drive device
  • AS/NZS 3500.0 Plumbing and drainage, Part 0: Glossary of terms*2021-02-26 Update

AS 4032.3:2004 history

  • 2022 AS 4032.3:2022 Water supply — Valves for the control of heated water supply temperatures, Part 3: Requirements for field-testing, maintenance or replacement of valves, taps and devices
  • 2004 AS 4032.3:2004 Water supply - Valves for the control of hot water supply temperatures - Requirements for field testing, maintenance or replacment of thermostatic mixing valves, tempering valves and end of line temperature control devices



Copyright ©2024 All Rights Reserved