ANSI/ISA 62382-2012
Control Systems in the Process Industry - Electrical and Instrumentation Loop Check

Standard No.
ANSI/ISA 62382-2012
Release Date
2012
Published By
American National Standards Institute (ANSI)
Latest
ANSI/ISA 62382-2012
Scope
Describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

ANSI/ISA 62382-2012 history

  • 2012 ANSI/ISA 62382-2012 Control Systems in the Process Industry - Electrical and Instrumentation Loop Check
Control Systems in the Process Industry - Electrical and Instrumentation Loop Check



Copyright ©2024 All Rights Reserved