- Standard No.
- NB/T 20077-2012
- Language
- Chinese, Available in English version
- Release Date
- 2012
- Published By
- Professional Standard - Energy
- Latest
-
NB/T 20077-2012
- Replace
-
EJ/T 821-1994
- Scope
- This standard specifies the criteria for timely acquis tion, processing and storage of seis ic instrument recording data in nuclear power plants, including initial assessment criteria to determine whether the ground motion at the site exceeds the power plant operating baseline earthquake (0BE). This standard is applicable to land-based light water reactor nuclear power plants, and other types of nuclear power plants can also be used as a reference. This standard does not apply to the following procedures: a) Power plant inspection procedures that need to be carried out immediately after an earthquake (within 8 hours); b) Procedures for ensuring safe and orderly shutdown; c) Procedures for long-term evaluation of response data of structures and equipment ; Procedures for power plant re-operation.
NB/T 20077-2012 Referenced Document
- NB/T 20076-2012 Earthquake instrumentation criteria for nuclear power plants
NB/T 20077-2012 history
- 2012 NB/T 20077-2012 Criteria for the handling and initial evaluation of records from nuclear power plants seismic instrumentation
- 1994 EJ/T 821-1994 Acquisition, review, processing and evaluation of nuclear power plant seismic instrumentation records
NB/T 20077-2012 Criteria for the handling and initial evaluation of records from nuclear power plants seismic instrumentation has been changed from EJ/T 821-1994 Acquisition, review, processing and evaluation of nuclear power plant seismic instrumentation records.