SY/T 6870-2012
Installation adjustment and maintenace of top drive drilling equipment for oil drilling rigs (English Version)

Standard No.
SY/T 6870-2012
Language
Chinese, Available in English version
Release Date
2012
Published By
Professional Standard - Petroleum
Status
 2022-02
Replace By
SY/T 6870-2021
Latest
SY/T 6870-2021
Scope
This standard specifies the basic requirements for the installation, commissioning and maintenance of the top driving device of oil drilling rigs and the methods of installation, commissioning and maintenance. This standard applies to the installation, commissioning and maintenance of the top drive (hereinafter referred to as "top drive") device of an oil drilling rig.

SY/T 6870-2012 Referenced Document

  • GB/T 19190 Petroleum and natural gas industries.Drilling and production hoisting equipment*2013-12-31 Update
  • SY/T 6726-2008 Top drive drilling system for oil drilling rigs

SY/T 6870-2012 history

  • 2021 SY/T 6870-2021 Installation, commissioning and maintenance of top drive systems for oil and gas drilling equipment
  • 2012 SY/T 6870-2012 Installation adjustment and maintenace of top drive drilling equipment for oil drilling rigs
Installation adjustment and maintenace of top drive drilling equipment for oil drilling rigs



Copyright ©2024 All Rights Reserved