Professional Standard - Recommended Standards for Engineering Construction
Status
Replace By
GOST R ISO/IEC 80079-34:2013
Latest
GOST R ISO/IEC 80079-34:2013
Scope
This procedure is applicable to the intelligent control of lighting, air conditioning fan coils, sunshades and other terminals in newly built, renovated and expanded civil buildings. The application of passive wireless intelligent control systems in various civil buildings is mainly realized through radio signal transmission.
CECS 296-2011 Referenced Document
GB 50303 Code for acceptance of construction quality of building electrical engineering*, 2015-12-03 Update
GB 50339 Code for acceptance of quality of intelligent building systems*, 2013-06-26 Update
GB/T 50314 Standard for design of intelligent building
CECS 296-2011 history
0000 GOST R ISO/IEC 80079-34:2013
2011CECS 296-2011 Technical specification for self-powered wireless intelligent control system
CECS 296-2011 Technical specification for self-powered wireless intelligent control system was changed to GOST R ISO/IEC 80079-34-2013 Explosive atmospheres. Part 34. Application of quality systems for equipment manufacture.