SL 179-2011
Specification on compiling preliminary design report of small hydropower stations (English Version)

Standard No.
SL 179-2011
Language
Chinese, Available in English version
Release Date
2011
Published By
Professional Standard - Water Conservancy
Status
 2019-08
Replace By
SL/T 179-2019
Latest
SL/T 179-2019
Replace
SL/T 179-1996
Scope
This standard is applicable to newly built (renovated, expanded) small hydropower stations with an installed capacity of 5-50MW. Small hydropower stations with an installed capacity of less than 5MW may be implemented as a reference.

SL 179-2011 history

  • 2019 SL/T 179-2019 Procedures for Preparation of Preliminary Design Report for Small Hydropower Stations
  • 2011 SL 179-2011 Specification on compiling preliminary design report of small hydropower stations
  • 1970 SL/T 179-1996 Specification on compiling preliminary design report of small hydropower stations

SL 179-2011 Specification on compiling preliminary design report of small hydropower stations has been changed from SL/T 179-1996 Specification on compiling preliminary design report of small hydropower stations.

Specification on compiling preliminary design report of small hydropower stations



Copyright ©2024 All Rights Reserved