Scope
This standard specifies the design criteria for the power system of a pressurized water cone nuclear power plant. This standard is applicable to pressurized water cone nuclear power plants designed with reference to the French 900MW series pressurized water cone nuclear power plant.

NB/T 20051-2011 Referenced Document

  • EJ/T 1197-2007 Testing method and environment condition for qualification of electrical equipment of the safety system in nuclear power plants
  • GB 1094.1-1996 Power transformers. Part 1: General
  • GB 1984 High-voltage alternating-current circuit-breakers*2014-06-24 Update

NB/T 20051-2011 history

  • 2011 NB/T 20051-2011 Design criteria for auxiliary power system of nuclear power plant
  • 2001 EJ/T 1134-2001 Design criteria for auxiliary Power systems of PWR nuclear power plants

NB/T 20051-2011 Design criteria for auxiliary power system of nuclear power plant has been changed from EJ/T 1134-2001 Design criteria for auxiliary Power systems of PWR nuclear power plants.

NB/T 20051-2011 Design criteria for auxiliary power system of nuclear power plant was changed to ANSI/ASHRAE/USGBC/IES 189.1-2011 Standard for High-Performance Green Buildings Except Low-Rise Residential Buildings.

Design criteria for auxiliary power system of nuclear power plant