The document contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes and other lifting and material-handling related equipment.
ASME B30.18-2011 history
2021ASME B30.18-2021 Stacker Cranes (Top or Under Running Bridge, Multiple Girder With Top or Under Running Trolley Hoist)
2016ASME B30.18-2016 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
2011ASME B30.18-2011 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
2004ASME B30.18-2004 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
1998ASME B30.18-1998 Stacker Cranes (Top Or Under Running Bridge Multiple Girder With Top Or Under Running Trolley Hoist)
1993ASME B30.18-1993 Stacker cranes (top or under running bridge, multiple girder with top or under running trolley hoist)