SY/T 6769.1-2010
Specifications for the disign,construction and acceptance of non-metallic pipelines.Part 1:High pressure fiberglass reinforced plastic linepipes (English Version)

Standard No.
SY/T 6769.1-2010
Language
Chinese, Available in English version
Release Date
2010
Published By
Professional Standard - Petroleum
Status
 2024-04
Replace By
SY/T 6769.1-2023
Latest
SY/T 6769.1-2023
Scope
This part of SY/T 6769 covers the selection conditions, basic regulations, technical limits, calculation methods, pipeline laying and connection design, pipe loading and unloading, and transportation of pipes and accessories in the design, construction, and acceptance of pipeline projects using high-pressure fiberglass line pipes. And storage, pipeline connection construction, pipeline installation construction, pressure test and completion acceptance are stipulated. This section applies to the pipeline engineering design, construction and acceptance of fiberglass reinforced plastic pipes produced according to SY/T 6267. This section applies to off-station buried fiberglass pipeline projects for new construction, expansion and renovation in oil fields.

SY/T 6769.1-2010 history

  • 2023 SY/T 6769.1-2023 Specifications for the design, construction and acceptance of non-metallic piping Part 1: High-pressure fiberglass line pipe
  • 2010 SY/T 6769.1-2010 Specifications for the disign,construction and acceptance of non-metallic pipelines.Part 1:High pressure fiberglass reinforced plastic linepipes
Specifications for the disign,construction and acceptance of non-metallic pipelines.Part 1:High pressure fiberglass reinforced plastic linepipes



Copyright ©2024 All Rights Reserved