ITU-T N.55 SPANISH-1993
Organization, Responsibilities and Functions of Control and Sub-control International Television Centres and Control and Sub-control Stations for International Television Connections, Links, Circuits and Circuits Sections

Standard No.
ITU-T N.55 SPANISH-1993
Release Date
1993
Published By
International Telecommunication Union (ITU)
Status
Latest
ITU-T N.55 SPANISH-1993
Scope
This Recommendation outlines the responsibilities and functions associated with the control and sub-control stations involved with an international television connection, including: the establishment of the connection; fault location; start and stop times and record keeping for charging purposes; TVROS.

ITU-T N.55 SPANISH-1993 Referenced Document

  • ITU-T D.180 Occasional provision of circuits for international sound- and television-programme transmissions Series D: General Tariff Principles; General tariff principles - International sound-and television-programme transmissions Study Group 3*2005-09-01 Update
  • ITU-T M.100 SERVICE CIRCUITS
  • ITU-T N.51 DEFINITIONS FOR APPLICATION TO INTERNATIONAL TELEVISION TRANSMISSIONS
  • ITU-T N.54 DEFINITION AND DURATION OF THE LINE-UP PERIOD AND THE PREPARATORY PERIOD
  • ITU-T N.62 Tests to Be Made During the Line-up Period That Precedes a Television Transmission - Maintenance of International Sound-Programme and Television Transmission Circuits Study Group IV; 9 pp
  • ITU-T N.64 Quality and Impairment Assessment

ITU-T N.55 SPANISH-1993 history

  • 1993 ITU-T N.55 SPANISH-1993 Organization, Responsibilities and Functions of Control and Sub-control International Television Centres and Control and Sub-control Stations for International Television Connections, Links, Circuits and Circuits Sections



Copyright ©2024 All Rights Reserved