This part specifies the design principles, equipment requirements and process procedures for gas phase underbalanced drilling. This section applies to onshore gas-phase underbalanced drilling, including gas drilling, atomization drilling and foam drilling.
2008SY/T 6543.1-2008 Technology specification for underbalanced drilling.Part 1:Liquid phase
2003SY/T 6543.2-2003 Specification for underbalanced drilling technology - Part 2:The outfit requirements of the wellhead pressure control and surface equipment
SY/T 6543.2-2009 Technology specification for underbalanced drilling.Part 2:Gas phase has been changed from SY/T 6543.1-2003 Specification for underbalanced drilling technology - Part 1:Methods for design.