This regulation stipulates the requirements and quality standards for factory manufacturing, installation and construction of aluminum and aluminum alloy silos (hereinafter referred to as silos). This procedure is applicable to the factory manufacturing and installation of silos with design pressures not higher than 10kPa and negative pressures not lower than 0.5kPa in petrochemical construction projects.
SH/T 3605-2009 Referenced Document
GB 50236 Code for construction of field equipment, industrial pipe welding engineering*, 2011-02-18 Update
GB 50484 Code for technical of construction safety in petrochemical engineering*, 2019-07-10 Update
GB/T 10858 Aluminum and aluminum alloy welding wire*, 2023-09-07 Update