This specification stipulates the general provisions for the design of the petrochemical center laboratory, the composition and layout of the laboratory, the configuration principles of analytical instruments and equipment, the design of laboratory pipelines, and the civil engineering, heating, ventilation and air conditioning, water supply and drainage, electrical, Design requirements for telecommunications and information management systems, instruments, etc. This specification applies to the design of newly built petrochemical center laboratories. Renovated and expanded central laboratories and equipment laboratories can refer to this implementation.
SH/T 3103-2009 Referenced Document
GB 50016 Architectural design code for fire protection
GB 50019 Design code for heating ventilation and air conditioning of industrial buildings*, 2015-05-11 Update
GB 50140 Code for design of extinguisher distribution in buildings (explanation)
GB 50160 Design Fire Protection Standards for Petrochemical Enterprises*, 2019-07-22 Update
SH 3004 Design code for heating, ventilation and air conditioning in petrochemical industry
SH 3017 Architectural code of petrochemical production design
SH/T 3042 Design code for heating, ventilation and air conditioning in synthetic fiber mills
SH/T 3103-2009 history
1970SH/T 3103-2019 Specification for laboratory design of petrochemical center
2009SH/T 3103-2009 Specification for design of central laboratory in petrochemical industry
1970SH/T 3103-2000 Techincal regulation for design of oil refinery central laboratory
1900SH/T 3103-1982 Technical regulations for the design of central laboratories in refineries (Trial)