GB/T 16558.5-2009 The ship maintenance system-Part 5: Schedule for work cards in the first maintenance period and cards operation requirements (English Version)
This part of GB/T 16558 specifies the first row of the ship repair and maintenance work card and its operation requirements. This part applies to the management of oceangoing, coastal and river transport ships. The management of engineering ships, warships and offshore installations can be implemented by reference.
GB/T 16558.5-2009 Referenced Document
GB/T 16558.4 The ship maintenance system-Part 4:Code and description for the work card and equipment card
GB/T 16558.5-2009 history
2009GB/T 16558.5-2009 The ship maintenance system-Part 5: Schedule for work cards in the first maintenance period and cards operation requirements
1996GB/T 16558.5-1996 The ship maintenance system.Planning schedule for work cards in the first maintenance period