FD 001-2007
Preparation rules and calculation standard for budgetary estimation of windpower projects feasibility study report (English Version)

Standard No.
FD 001-2007
Language
Chinese, Available in English version
Release Date
2007
Published By
Professional Standard - Technical Standards for Wind Farm Engineering
Latest
FD 001-2007
Scope
This method is applicable to the preparation of design estimates for feasibility study reports of large and medium-sized wind farm projects planned and constructed, and other wind farm projects may be implemented based on specific circumstances. It can also be referred to when preparing the investment estimate of the above-mentioned project pre-feasibility study report.

FD 001-2007 history

  • 2007 FD 001-2007 Preparation rules and calculation standard for budgetary estimation of windpower projects feasibility study report
Preparation rules and calculation standard for budgetary estimation of windpower projects feasibility study report



Copyright ©2024 All Rights Reserved