ASME B18.18.5M-1998
Inspection and Quality Assurance Plan Requiring In-Process Inspection and Controls

Standard No.
ASME B18.18.5M-1998
Release Date
1998
Published By
American Society of Mechanical Engineers (ASME)
Status
Latest
ASME B18.18.5M-1998
Replace By
ASME B18.18:2011
Scope
This Standard outlines a Quality Assurance Plan for internally and externally threaded fasteners and accessories or associated parts. Provisions are included for sampling plans, inspection frequencies, control procedures, and record keeping. The basic structure of this plan outlines the quality assurance provisions for fasteners manufactured and processed using in-process controls. Included are fasteners produced by one manufacturing practice requiring records of in-process inspection and tests which are maintained by the producers. This Standard will be used in conjunction with other accepted standards for product, testing, gaging, and material, and, therefore, those provisions as well as packaging are not included herein.

ASME B18.18.5M-1998 history

  • 1998 ASME B18.18.5M-1998 Inspection and Quality Assurance Plan Requiring In-Process Inspection and Controls
Inspection and Quality Assurance Plan Requiring In-Process Inspection and Controls



Copyright ©2024 All Rights Reserved