This standard specifies the hoisting organization and hoisting preparation of large equipment, the installation and use of mast cranes (including gantry cranes, the same below), the use of mobile cranes (crawler cranes, tire cranes and truck cranes), the control of the hoisting process, etc. Basic requirements for safe production. This standard is applicable to the hoisting of large equipment in newly built, renovated (expanded) construction and maintenance oilfield ground engineering and petrochemical engineering projects.
SY 6279-2008 Referenced Document
GB 5082 The commanding signal for lifting and moving
GB 6067.1 Safety rules for lifting appliances.Part 1:General*, 2010-09-26 Update
GB 6067.5 Safety rules for lifting appliances.Part 5:Bridge and gantry cranes*, 2014-09-03 Update
GB/T 5972 Crane wire rope care, maintenance, inspection and scrapping*, 2023-05-23 Update
SY 6279-2008 history
2022SY/T 6279-2022 Safety regulations for hoisting large equipment
2016SY/T 6279-2016 Safety code for lifting large equipment
2008SY 6279-2008 Safety code for lifting large equipment
1997SY 6279-1997 Safety code for lifting large tower equipment
SY 6279-2008 Safety code for lifting large equipment was changed to SY/T 6279-2016 Safety code for lifting large equipment.