UIC R 719-2008
Earthworks and track bed for railway lines

Standard No.
UIC R 719-2008
Release Date
2008
Published By
IX-UIC
Latest
UIC R 719-2008
Scope
This leaflet relates to earthworks and track beds for ballasted track. The study of railway track substructure can be considered as two separate subjects: the design of track bed layers and earthworks for new lines; maintenance of the track bed layers and earthworks on existing lines, which show signs of ageing or are exposed to a more severe loading regime (increase in gross tonnage, axle-load or speed). The technical design life considered in this leaflet for substructure is of 100 years. The leaflet is divided into 3 sections: - terminology and classification of soils and subgrades, - construction of earthworks and track bed layers for new lines, - maintenance of earthworks and track bed layers on existing lines.

UIC R 719-2008 history




Copyright ©2024 All Rights Reserved