UIC OR 450-2-2007
Exchange of data concerning the running of international passenger and freight trains between Infrastructure Managers for the purpose of quality analysis

Standard No.
UIC OR 450-2-2007
Release Date
2007
Published By
IX-UIC
Status
 2009-06
Replace By
UIC OR 450-2-2009
Latest
UIC OR 450-2-2009
Scope
Every Infrastructure Managers (IM) (see List of abbreviations - page 26) bears a heavy responsibility for the reliability of the train movements on his network. Punctuality is one of the vital factors in the quality of train service. The purpose of this Leaflet is therefore to enable the IM and any other bodies involved in international traffic to acquire uniform data on the reliability of international passenger and freight train movements. The data is collected using uniform methods and definitions. On the basis of the data provided, it should be possible to identify weak points and then to take the organisational steps or apply the technical measures necessary, or else to arrange rescheduling. The Leaflet allows for the collection, preparation and transmission of data either manually or by computer. The standardisation of the data and the rules governing its electronic transmission and processing are covered by UIC Leaflet 407-1 (see Bibliography - page 27). The contents of the Leaflet are binding on all IMs involved in the execution of international quality analysis. Those areas which are merely recommended are expressly indicated as such in the text.

UIC OR 450-2-2007 history

  • 2009 UIC OR 450-2-2009 Assessment of the performance of the network related to rail traffic operation for the purpose of quality analyses - delay coding and dilay cause attribution process
  • 2007 UIC OR 450-2-2007 Exchange of data concerning the running of international passenger and freight trains between Infrastructure Managers for the purpose of quality analysis



Copyright ©2024 All Rights Reserved